Pictures taken en route, and on the
GREAT SALTEE ISLAND
DXPEDITION
June 1994
| Here in the Welsh mountains,the van decided to drop a wheel bearing.We managed to limp to a lay bye where there
was an AA phone. Help arrived within 20 minutes ! Well done the AA ! |
| After a very harrowing trip through mountain roads at over 65mph(The van was carrying 1.5 tonnes of equipment),we
arrived at a small garage where we aquired and fitted the new bearing before continuing on our way to the ferry
port and EIRE. |
|
|
Arriving at our departure point of Kilmore Quay in deepest Co.Wexford, we unloaded the van and proceeded to load it all onto the fishing vessel "West Island" (the smaller of the two ).The tide was ebbing and there was a drop of around 3 meters to the deck ! |